Estimate the value of your review coordination using your own numbers.
Model Submittal and RFI review volume, current coordination hours, selected plan cost, and a practical efficiency scenario.
Estimate with visible assumptions and standard plan pricing.
- Submittal/RFI volume
- Coordination hours
- Loaded hourly rate
- User-entered efficiency
- Standard plan pricing
- Illustrative estimate
Calculator
Start with your current review workload.
The calculator keeps assumptions editable and visible so you can review the scenario before applying the estimate.
Enter your assumptions to see an estimate. Values stay in your browser; ConstructFlow does not save, submit, or send them.
Annualized estimated value
/ year
At this scenario, the estimated value is below the selected plan cost. Adjust review volume, coordination hours per item, or plan selection to compare.
- Monthly review volume
- Monthly coordination hours
- Estimated coordination hours recovered
- Estimated labor value
- Optional delay / rework scenario
- Estimated gross monthly value
- Selected plan cost
- Estimated net monthly value
Results are illustrative estimates based on the assumptions you entered. They are not a quote, contract, accounting analysis, tax advice, delay-damages calculation, or savings guarantee. ConstructFlow does not save, submit, or send these values.
Methodology
The formula stays visible.
Each result traces back to an entered assumption, the selected ConstructFlow plan cost, or the optional delay and rework scenario field.
The calculator uses the Submittal and RFI volume you enter, estimates the coordination hours that work consumes today, and applies your expected efficiency improvement. Labor value uses your loaded hourly rate. Optional delay or rework exposure is included only when you enter a positive scenario value. The selected ConstructFlow plan cost is subtracted so the final figures stay tied to the plan you chose.
Formula order
- 1. Monthly review items = active projects × (Submittals per project + RFIs per project).
- 2. Monthly coordination hours = monthly review items × coordination / rework hours per item.
- 3. Estimated coordination hours recovered = monthly coordination hours × expected efficiency improvement percentage.
- 4. Estimated labor value = estimated coordination hours recovered × loaded hourly rate.
- 5. Optional delay / rework scenario = the monthly scenario value you enter, or $0 when the field is blank or zero.
- 6. Estimated gross monthly value = estimated labor value + optional delay / rework scenario.
- 7. Estimated net monthly value = estimated gross monthly value − selected plan cost.
- 8. Annualized estimated value = estimated net monthly value × 12.
Selected plan cost is the monthly ConstructFlow plan value chosen in the calculator. It is subtracted in step 7 and shown as its own result row so you can compare the estimate against our standard plans.
Results are illustrative estimates based on the assumptions you entered. They are not a quote, contract, accounting analysis, tax advice, delay-damages calculation, or savings guarantee. ConstructFlow does not save, submit, or send these values.
Pricing context
Compare the estimate against our standard plans.
See how your estimated value stacks up against our monthly plans. Full package details are available on the Pricing page.
Plan pricing
The estimate subtracts the plan you select.
Use the plan selector in the calculator to compare Standard, Professional, and the Enterprise starting floor. Final Enterprise pricing can vary with custom AI Search capacity, support, and infrastructure requirements.
Standard
$1,200/month
Professional
$2,800/month
Enterprise
From $6,500/month
ROI calculator FAQ
Common questions about the estimate.
Practical answers about defaults, assumptions, plan cost, optional scenario values, and data handling.
Why are the operating fields blank?
Blank fields keep the estimate grounded in your actual workflow. Enter your active projects, monthly Submittal and RFI volume, coordination hours, loaded hourly rate, and expected efficiency improvement to build a scenario.
Are these results a guarantee?
No. The estimate is an illustrative scenario based on the values you enter. It is not a quote, contract, accounting analysis, tax advice, delay-damages calculation, or savings guarantee.
Does ConstructFlow store the numbers I enter?
No. The calculator runs directly in your browser and does not save, submit, email, store in cookies or local storage, or send your values to analytics.
What does expected efficiency improvement mean?
It is the percentage of current Submittal/RFI coordination hours you expect your team could reclaim with a more structured review process. Enter your own conservative assumption.
Why does the calculator subtract a plan cost?
The calculator subtracts the selected monthly ConstructFlow plan cost so the estimate reflects the plan you chose. Standard uses $1,200/month, Professional uses $2,800/month, and Enterprise uses $6,500/month as the starting floor for illustration. Final Enterprise pricing can vary with custom capacity requirements. See Pricing for the full package comparison.
What should I enter for optional delay or rework exposure?
Leave it blank unless you want to model a specific monthly scenario value. The calculator excludes that row when the field is blank or zero, so the core estimate remains based on coordination labor only.
Ready for a closer look
Walk through the estimate with your review workflow.
Bring your Submittal and RFI volume, current coordination steps, and plan questions to a ConstructFlow walkthrough.